Compare work completed by its due date against the jobs due in the same period.
PM compliance
MaintBoard helps plant teams schedule preventive maintenance, assign recurring work, and see which jobs were completed on time. Technicians record readings and findings on the work order, and supervisors can assign repairs that come out of a check.

A lubrication job is moved because the line is still running. At the next planning meeting, the team needs to know which checks were done and when the rest can be completed.
When production needs the line, a lubrication job can carry into the next week without a new date.
A checked box shows that the step was done. The next technician still needs the reading or observation.
A technician may find a worn belt during a check. Replacing it may require a separate work order.
Take a weekly check on a conveyor drive. The checklist and due date give the supervisor a clear job to assign and review.
Choose the conveyor, set the frequency, and add the lubrication, belt condition, and drive checks.
Coordinate the due work with production and give the technician the checklist.
The technician completes the steps and records a worn belt. Assign a corrective work order for the replacement and track it separately.
Choose the conveyor, set the frequency, and add the lubrication, belt condition, and drive checks.
Coordinate the due work with production and give the technician the checklist.
The technician completes the steps and records a worn belt. Assign a corrective work order for the replacement and track it separately.
Set recurring jobs by calendar or meter reading where appropriate.
Record checks, observations, and readings with the job. Explore digital maintenance checklists .
Review completed jobs by machine before revising the plan. Explore equipment maintenance history .
Schedule service by running hours where the meter is maintained.
Plan routine lubrication and condition checks during line availability.
Use repeatable inspection steps and record defects for the next maintenance window.
Compare work completed by its due date against the jobs due in the same period.
PM compliance
Review the equipment affected and agree when it can be released.
Overdue jobs
Check whether a corrective order has been assigned and completed.
Open findings
Pick one machine with a recurring job. We'll show how to set up the schedule, record the checks, and track a repair that comes out of the inspection.