Electrical MaintenancePI

Polarization Index

Polarization Index is the ratio of insulation resistance measured after ten minutes to the resistance measured after one minute during a timed insulation test.

What this term means in maintenance

Polarization Index is the ratio of insulation resistance measured after ten minutes to the resistance measured after one minute during a timed insulation test.

Formula

PI = 10-minute insulation resistance ÷ 1-minute insulation resistance

Practical example

A winding measures 500 megohms at one minute and 1,000 megohms at ten minutes.

PI = 2.0

What PI can indicate

The result may provide information about insulation cleanliness, moisture, contamination, and condition.

Interpretation

Acceptance depends on equipment type, insulation system, temperature, history, and applicable guidance.

Limitations

Some modern insulation systems may produce different behavior, and one result should not be interpreted without context.

Common mistake

Using one universal PI limit for every machine and insulation type can be misleading.

Keep exploring connected CMMS, reliability, and maintenance planning terms.

Glossary FAQs

What does PI stand for?

PI stands for Polarization Index.

How is PI calculated?

Ten-minute insulation resistance divided by one-minute insulation resistance.

Can one PI limit apply to every machine?

No. Equipment type, insulation system, temperature, history, and guidance matter.

Turn Maintenance Definitions Into Action

MaintBoard helps plant and facility teams move from scattered maintenance records to organized work orders, preventive maintenance schedules, spare parts control, inspections, calibration, and audit-ready history.