Risk and ReliabilityRPN

Risk Priority Number

Risk Priority Number is a numerical value commonly calculated from severity, occurrence, and detection ratings during FMEA.

What this term means in maintenance

Risk Priority Number is a numerical value commonly calculated from severity, occurrence, and detection ratings during FMEA.

Common formula

RPN = Severity × Occurrence × Detection

Practical example

A failure mode has:

  • Severity: 8
  • Occurrence: 4
  • Detection: 5

RPN = 160

Use

RPN helps compare and prioritize failure modes within a controlled assessment method.

Limitations

Different combinations can produce the same RPN even when risk characteristics differ.

High-severity items should not be ignored because occurrence appears low.

Common mistake

Treating one universal RPN threshold as the complete risk decision can hide serious consequences.

Keep exploring connected CMMS, reliability, and maintenance planning terms.

Glossary FAQs

What does RPN stand for?

RPN stands for Risk Priority Number.

How is RPN calculated?

Severity multiplied by occurrence multiplied by detection.

What is an RPN limitation?

Different risk combinations can produce the same number, and high severity can be hidden.

Turn Maintenance Definitions Into Action

MaintBoard helps plant and facility teams move from scattered maintenance records to organized work orders, preventive maintenance schedules, spare parts control, inspections, calibration, and audit-ready history.