Production Metrics

Takt Time

Takt time is the rate at which production must complete one unit to meet customer demand within the available production time.

What this term means in maintenance

Takt time is the rate at which production must complete one unit to meet customer demand within the available production time.

Formula

Takt time = Available production time ÷ Customer demand

Practical example

A shift provides 420 available minutes and demand is 210 units.

Takt time = 2 minutes per unit

Takt time versus cycle time

Takt time is demand-driven.

Cycle time is the actual time required by the process to produce a unit.

Maintenance connection

Equipment must be reliable and capable of sustaining the required cycle time below or equal to takt.

Common mistake

Using total shift duration without removing planned breaks and unavailable production time overstates capacity.

Keep exploring connected CMMS, reliability, and maintenance planning terms.

Glossary FAQs

What is takt time?

Available production time divided by customer demand.

How is takt different from cycle time?

Takt is the required pace; cycle time is actual process duration.

What time should be used?

Available production time after removing planned unavailable periods.