Commissioning and HandoverFAT

Factory Acceptance Test

A Factory Acceptance Test verifies equipment, panels, software, or systems at the supplier's facility before shipment.

What this term means in maintenance

A Factory Acceptance Test verifies equipment, panels, software, or systems at the supplier's facility before shipment.

What FAT may verify

Testing may include:

  • Design requirements
  • Dimensions
  • Materials
  • Controls
  • Alarms
  • Interlocks
  • Software
  • Performance
  • Documentation
  • Spare parts

Practical example

A control panel is powered and tested at the manufacturer before delivery to the plant.

FAT documents

The test should use an approved procedure, acceptance criteria, results, deviations, punch list, and signatures.

Limitations

FAT cannot prove every site condition, installation interface, or actual process load.

Common mistake

Shipping equipment with unresolved critical FAT failures transfers known problems to the site.

How this term differs

Factory Acceptance Test is supplier-site testing before equipment shipment. It is related to Site Acceptance Test, Operational Qualification, and Performance Qualification, but these terms describe different records, measures, roles, strategies, or decisions and should not be used interchangeably.

Keep exploring connected CMMS, reliability, and maintenance planning terms.

Glossary FAQs

What does FAT stand for?

FAT stands for Factory Acceptance Test.

Where is FAT performed?

At the supplier or manufacturer's facility before shipment.

What does FAT not prove?

Actual site utilities, installation interfaces, and full operating conditions.

Turn Maintenance Definitions Into Action

MaintBoard helps plant and facility teams move from scattered maintenance records to organized work orders, preventive maintenance schedules, spare parts control, inspections, calibration, and audit-ready history.