Commissioning and HandoverSAT

Site Acceptance Test

A Site Acceptance Test verifies that installed equipment or systems operate correctly in the actual plant environment after delivery and installation.

What this term means in maintenance

A Site Acceptance Test verifies that installed equipment or systems operate correctly in the actual plant environment after delivery and installation.

What SAT may verify

Testing may include:

  • Installation
  • Utilities
  • Interfaces
  • Controls
  • Alarms
  • Interlocks
  • Communication
  • Performance
  • Safety functions
  • Documentation

Practical example

A new packaging line is tested with actual site power, controls, materials, operators, and upstream and downstream interfaces.

FAT versus SAT

FAT occurs at the supplier before shipment.

SAT occurs at the operating site after installation.

Acceptance

Results, deviations, punch items, restrictions, and approval should be documented.

Common mistake

Repeating only the FAT steps without testing site utilities and interfaces leaves installation problems undiscovered.

How this term differs

Site Acceptance Test is testing after installation in the actual plant environment. It is related to Factory Acceptance Test, Installation Qualification, and Commissioning, but these terms describe different records, measures, roles, strategies, or decisions and should not be used interchangeably.

Keep exploring connected CMMS, reliability, and maintenance planning terms.

Glossary FAQs

What does SAT stand for?

SAT stands for Site Acceptance Test.

When is SAT performed?

After equipment is delivered and installed at the operating site.

How is SAT different from FAT?

SAT verifies actual installation, utilities, interfaces, controls, and site conditions.